PORTFOLIO

SELECTED PROJECTS.

Substations, industrial facilities, renewables, commercial builds, and mission-critical infrastructure — delivered by owned crews with owned equipment.

Sample projects shown for illustration. Contact us for a client-specific reference list.

Substation Rebuild — Northern Nevada
Utility

Substation Rebuild — Northern Nevada

Client

Investor-Owned Utility

Size

34.5 kV / 12.47 kV

Schedule

9 months

Scope

Full substation demolition, structural foundations, control house, protective relaying, SCADA integration, commissioning.

Challenge

Live-bus construction adjacent to energized distribution feeders serving critical load.

Solution

Phased outage plan with utility operations, temporary switching, and self-performed civil + electrical crews under one PM.

Result

Zero unplanned outages. On-schedule energization.

Discuss a Similar Project ↗
Utility-Scale Solar Collection
Renewable

Utility-Scale Solar Collection

Client

Renewable Developer

Size

150 MW AC

Schedule

14 months

Scope

MV collection system, inverter pads, DC combiner installation, POI substation electrical.

Challenge

Aggressive PPA milestone with tracker installation running in parallel.

Solution

Engineering-driven sequencing and pre-fab MV terminations delivered ahead of tracker mechanical crews.

Result

Commercial operation achieved on the PPA deadline.

Discuss a Similar Project ↗
Industrial Facility Expansion
Industrial

Industrial Facility Expansion

Client

Manufacturing Client

Size

180,000 SF

Schedule

11 months

Scope

Site prep, foundations, structural steel electrical, MCC installation, process controls integration.

Challenge

Live production areas immediately adjacent to expansion tie-in.

Solution

Off-hours cut-overs coordinated with plant operations; controls staged and burned-in before final tie-in.

Result

Zero production loss during cut-over weekend.

Discuss a Similar Project ↗
Municipal Roadway & Underground
Civil

Municipal Roadway & Underground

Client

Nevada Municipality

Size

1.4 miles

Schedule

6 months

Scope

Roadway improvements, drainage, underground utilities, structural concrete, restoration.

Challenge

Maintaining commuter flow through active corridor.

Solution

Night work, phased traffic control, public communications with municipal staff.

Result

Delivered under budget with commendation from municipal engineering.

Discuss a Similar Project ↗
Commercial EV Charging Hub
Electrical

Commercial EV Charging Hub

Client

Commercial Developer

Size

24 DCFC stalls

Schedule

5 months

Scope

MV service, transformer pad, switchgear, DC fast-charging equipment installation, commissioning.

Challenge

Utility service upgrade coordination on constrained timeline.

Solution

Early engagement with utility, self-performed civil for pad and duct bank.

Result

Fully commissioned and operational for site grand opening.

Discuss a Similar Project ↗
Mining Process Electrical Upgrade
Industrial

Mining Process Electrical Upgrade

Client

Nevada Mining Operator

Size

Multi-MCC

Schedule

Shutdown window

Scope

MCC replacement, motor control programming, conveyor power, controls tie-in.

Challenge

Fixed shutdown window with no schedule flexibility.

Solution

Pre-staged switchgear, parallel crews, 24/7 execution with MSHA-experienced supervision.

Result

Facility restarted on-schedule after shutdown.

Discuss a Similar Project ↗
Data Center Standby Power
Electrical

Data Center Standby Power

Client

Mission-Critical Operator

Size

Multi-MW standby

Schedule

8 months

Scope

Generator paralleling switchgear, UPS distribution, load bank testing, commissioning.

Challenge

Zero-downtime tie-in to a live facility.

Solution

Redundant temporary feeds, staged commissioning, coordinated with client ops.

Result

Successful integrated systems test with no service impact.

Discuss a Similar Project ↗
Structural Concrete — Equipment Pads
Concrete

Structural Concrete — Equipment Pads

Client

Renewable Developer

Size

Multiple pads

Schedule

3 months

Scope

Excavation, formwork, rebar, placement, and finishing for inverter and BESS equipment pads.

Challenge

Tight tolerances required for equipment anchor patterns.

Solution

Templated formwork and QA/QC on every placement.

Result

All pads accepted on first equipment mounting.

Discuss a Similar Project ↗
Commercial Tenant Improvement — Fit-Out
Commercial

Commercial Tenant Improvement — Fit-Out

Client

Regional Retail

Size

45,000 SF

Schedule

4 months

Scope

Interior electrical, lighting, distribution, low-voltage rough-in, TCO support.

Challenge

Multiple trades in the space with fixed opening day.

Solution

Weekly pull-plan coordination and self-performed crews across trades.

Result

Opened on scheduled grand opening date.

Discuss a Similar Project ↗
24/7 Facility Maintenance Program
Industrial

24/7 Facility Maintenance Program

Client

Industrial Client

Size

Ongoing

Schedule

Annual

Scope

Preventive maintenance, electrical testing, generator service, on-call emergency response.

Challenge

Facility cannot afford unplanned downtime.

Solution

Scheduled PM windows, condition-based testing, 24/7 emergency crew.

Result

Documented uptime improvements year-over-year.

Discuss a Similar Project ↗